CONSTRUCTION

Projects

Current Projects

4TH Re-Regulating Reservoir Project - SOQ

Enclosed Lateral Improvement Project (ELIPS)

The Enclosed Lateral Improvement Project (ELIPS), which consists of replacing low head lateral systems and weir boxes with gravity pressure pipe and flow meters, began spring of 2009. The anticipated completion date is 2042.  

Bid Results

2024 SVID Shotcrete/Concrete Materials Bid
2024 Perforated HDPE Pipe Bid
2023 SVID Aquatic Herbicide Materials Bid
2023-2024 SVID Pipe Materials Bid
2022-2023 ELIPS Pipe Bid
ELIPS - SPRING Pipe Bid Summary 22-23
2022 SVID Perforated HDPE Pipe

Resources

Permits

Permits are required for encroachments and crossings within SVID right of way and easementsAn information sheet is provided with standard easement widths for SVID facilitiesPlease contact the District Engineering department to begin the permitting process.

Short & Long Plats

Information sheets provide general information about the SVID irrigation requirements for subdividing property within Yakima and Benton CountyFor specific information about the irrigation requirements of your parcel contact the District Engineering Department. 

Forms

Scroll to Top